Project Description
Installed two 15-Ton ground package heat pumps with 40’ of vertical ducting to 4th floor, all exposed interior duct and controls.
Installed two 15-Ton ground package heat pumps with 40’ of vertical ducting to 4th floor, all exposed interior duct and controls.
11:00 AM | One (1) Annual HVAC System Preventative Maintenance Plan |
11:20 AM | I-Wave Air Quality Product |
11:40 AM | Waived Dispatch Fee on any regular service call |
12:00 PM | One (1) Programmable Thermostat for any Package Unit, Minisplit or Conventional Split System |
12:20 PM | $500 OFF Any HVAC Complete System Install |
12:40 PM | One (1) Whole House Fan |
1:00 PM | One (1) Box of HVAC Filters for any Traditional Unit or Evaporative Cooler |
1:20 PM | One (1) Roll of any size cooler pad media or hogs hair roll |
1:40 PM | One After Hours Dispatch Fee Waived during regular service call |
2:00 PM | Complete HVAC System- Installed by Air-O Service |